Basic Rights of Member-Consumer-Owners (MCOs)
- To have quality, reliable, affordable, safe, and regular supply of electric power.
- To be accorded courteous, prompt, and non-discriminatory service by the electric service
provider.
- To be given a transparent, non-discriminatory, and reasonable price of electricity
consistent with the provisions of RA 9136.
- To be an informed electric consumer and given adequate access to information on matters
affecting the electric service of the consumer concerned.
- To be accorded prompt and speedy resolution of complaints by both the distribution
utility and/or the ERC.
- To know and choose the electric service retailer upon the implementation of Retail
Competition.
- To organize themselves as a consumer organization in the franchise area where they
belong and where they are served by the distribution utility or as a network of
organizations.
Basic Obligations of Member-Consumer-Owners (MCOs)
- To observe the terms of his contract including, among other things, paying monthly
electricity bills promptly and honestly.
- To allow the faithful and accurate recording of consumption to be reflected in the
appropriate device.
- To allow the utility’s employees / representatives entry/access to his premises for the
purposes provided for in Article 29 hereof.
- To take proper care of metering or other equipment that the electric utility has
installed in his premises.
- To inform the distribution utility and/or proper authorities of ant theft or pilferage
of electricity or any damage caused by any person to the electric meter and equipment
appurtenant thereto.
- To cooperate with and support programs on the wise and efficient use of electricity.
Basic Rights of Member-Consumer-Owners (MCOs)
Normally occurs a month after the kwh meter installation.
Reading Schedule
- Starts from the 10th day of the Month up to 30th day of the Month.
- Assigned Meter Reader of the Area.
- This will vary every 3 months.
- Collection - happens after billing collection of payment for electric consumption.
- Billing - after meter reading, billing takes place every month. The term “month”
for billing will mean the period between 2 consecutive meter readings. Reading is
made as nearly as practicable every thirty (30) days.
- MCOs must pay their electric bill on or before the Due Date.
Note:
Due Date
9 days after reading and issuance of electric bill.
- Starts from the 10th day of the Month up to 30th day of the Month.
- Assigned Meter Reader of the Area.
- This will vary every 3 months.
- Collection - happens after billing collection of payment for electric consumption.
- Billing - after meter reading, billing takes place every month. The term “month” for billing will mean the period between 2 consecutive meter readings. Reading is made as nearly as practicable every thirty (30) days.
- MCOs must pay their electric bill on or before the Due Date.
Power Interruptions
Contact Us
Contact numbers
Landlines
561-4466 (Globe)
839-3920 (PLDT)
839-3921 (PLDT)
24/7 Hotline Number (Calls Only)
0917-683-7230 (Globe/TM)
Email Address
info@leyeco-v.com.ph
Addresses
Main Office
Brgy. San Pablo, Ormoc City, Leyte
Palompon Suboffice
Brgy. San Isidro, Palompon, Leyte
Calubian Suboffice
Brgy. Gutosan, Calubian, Leyte
Talisayan Substation
Brgy. Talisayan, Albuera, Leyte
Mahayag Substation
Brgy. Mahayag, Isabel, Leyte
Sambulawan Substation
Brgy. Libas, Sitio Sambulawan, Leyte, Leyte
Tabango Substation
Brgy. Poblacion, Sitio Tambis 1, Tabango, Leyte
Libongao Substation
Brgy. Libongao, Kananga, Leyte
Alta Vista Substation
Brgy. Alta Vista, Ormoc City, Leyte